Archive

Published: Građevinar 68 (2016) 9
Paper type: Professional paper
Download article (Croatian): PDF
Download article (English): PDF

Repair of Krk Bridge

Boris Huzjan, Nina Ostojić

Abstract

The construction chronology of both arches of the Krk Bridge is described, and specific features of the site on which the bridge was built are given. The influence of the arches on the reinforced concrete structure of the bridge is explained. A general overview of analyses conducted on the small and large arches of the bridge is given, and the proposed repair and protection solutions are presented. The results of the last chloride penetration analysis, and the report submitted after final repair, are described in great detail.

Keywords
Krk bridge, chloride penetration, analyses, repairs, protection

HOW TO CITE THIS ARTICLE:

Huzjan, B., Ostojić, N.: Repair of Krk Bridge, GRAĐEVINAR, 68 (2016) 9, pp. 735-743, doi: https://doi.org/10.14256/JCE.1430.2015

OR:

Huzjan, B., Ostojić, N. (2016). Repair of Krk Bridge, GRAĐEVINAR, 68 (9), 735-743, doi: https://doi.org/10.14256/JCE.1430.2015

LICENCE:

Creative Commons License
This paper is licensed under a Creative Commons Attribution 4.0 International License.
Authors:
BHWEB
Boris Huzjan
Hrvatske autoceste, održavanje i naplata cestarine, HAC-ONC
Nina Ostojic WEB
Nina Ostojić
Autocesta Rijeka-Zagreb d.d.